Home » Search Properties | DOTOLI group
-Heavy-duty concrete construction (1972) with thick concrete slab floors-7 overhead cranes (5 – 25 ton)-Fire sprinklers -240v/480v 3 phase power, transformers, overhead power, gas, and air lines-Powered roll-up doors-High ceilings (23 – 46 ft clear to rafters)-Modern office space-Fenced and paved outdoor storage-Versatile zoning: IL (Industrial Light)-Quick access to I-95 and 15 minute drive to airport and ports
Listing Updated: 2024-06-24 00:57:00